Nimpkish River 2003 Yookwa Creek construction report

This report describes the Yookwa Creek portion of the restoration work completed in Nimpkish River watershed during the 2003 instream construction window after several years of study. The Nimpkish Watershed Restoration Plan, 2002-2006 developed by ALBY Systems Ltd. (2001) ranked Reach Y1 of Yookwa Creek the highest priority reach for restoration in the Nimpkish Watershed.

Guide to Ecological Reserves in BC

This 371 page, 50 mb book may be downloaded from http://www.for.gov.bc.ca/HFD/library/documents/bib32374.pdf Thanks to Jody Krakowski ER warden for Baynes Island ER #69 for showing us the  location of this important document.  It provides a page and a map on each of the reserves created up to 1992. Include are the Ecological Reserves now lost from

Nimpkish River Ecological Reserve Tall Trees report 1983, and letters.

George Lepore, Director Area D( Nimpkish)  Regional District of Mount Waddington did this report for  the Wilderness Advisory Committee in 1983, before the creation of the reserve. There are also several letters about the politics leading up to the decision to protect the park, especially of note are the lobbying letters from Vladimir Krajina. See